Commercial
Residential
Institutional
Goverment
Industrial
 
Commercial Projects
 

Ayala Corporation Boardroom

Located at the 35th floor penthouse within Ayala Tower One, the Ayala Corporation Boardroom completes the executive offices of one of the country’s blue-chip, listed companies. Above the second tallest atrium in the country as the main entrance to these facilities, this sophisticated conferencing facility is equipped with a state-of-the-art audio system, fully integrated with computers and wide screen video display.IACAI provided Project and Construction Management services for the 8 month design period and 5 month construction period.

Client : Ayala Corporation
Area : 80 square meters (860 sq. Ft.)
Cost : Ph Pesos 32 Million (US$ 1.8 Million)

Sun Life Financial Asia-Pacific Headquarters

Located at the crossing of two of the most important roads in the country’s financial district Makati, Sun Life Financial makes their home on Floors 10th to 16th of the Enterprise Center, Tower 2. These offices house the Asia-Pacific Headquarters for offices of the Canadian Insurance brokerage and mutual fund firm. Design features include well-furnished work stations, training facilities, boardroom, conference / meeting rooms, staff dining facilities, kitchen, and computer IT /data communication rooms.

IACAI provided Project Management and Construction Management for the 5 month design and 120 days construction period.

Client : Sun Life of Canada (Phils.), Inc.
Area : 7,220 square meters (70,000 sq. ft.)
Cost : Ph Pesos 180 Million (US$ 4.5 Million)

PBCom Tower Food Court

Located at the seventh floor of the tallest High-Rise Office Building in the Philippines, at the center of the country’s financial district Makati, PBCom Tower Food Court caters to the various culinary needs of the tower’s nearly 5,000 occupants. The series of restaurant outlets are designed to include adjacent Dining Room facilities both within the tower and also an Outdoor Dining Area at the adjoining Roof Garden. Kitchen support facilities are conveniently central to all individual outlets. IACAI provided Project Management, Construction Management and Cost Estimating services for the 5-month design and 5 months construction period.

Client : Philippine Bank of Communications
Area : 1,170 square meters (15,000 sq. ft.)
Cost : Ph Pesos 40 Million (US$ 1.5 Million)

METROBANK CARD CORPORATION

Metrobank, in association with Australian New Zealand Bank, relocated their credit card operation units from their offices in GT Tower and AXA to a fully refurbished 13-storey office, with 1 basement to include an expanded services of business process outsourcing and call center provider.

IACAI provided Project and Construction Management services during the fast tracked 60-day planning and 5 months construction period.

Client : Metrobank Card Corporation
Area : 10,300 square meters (110,800 sq. ft.)
Cost : Ph Pesos 264 Million (US$ 5.5 Million)


 

Adress : Unit 604 Cattleya Bldg., 235 Salcedo St., Legaspi Village, Makati City 1229 Philippines
Phone : (063-2) 893-4931, Fax: (063-2) 813-1699
copyright 2015 I.A CAMPBELL. All rights reserved.