Commercial
Residential
Institutional
Goverment
Industrial
 
Commercial Projects
 

Philippines - Australia Governance Facility (PAGF)

Relocated to the 17th Floor of Equitable Bank Tower along Paseo de Roxas, in the central business district of Makati, the offices of PAGF now make their new home. This quasi-government organization required a relocation from their prior facility and a reconfiguration of strategy in planning for their new facilities to include expansion capacity for 10 additional staff.
IACAI provided Project and Construction Management and Cost Estimating services during the fast-tracked 60-day planning and 90-day construction periods.

Client : Philippines - Australia Governance Facility
Area : 625 square meters (6,800 sq. ft.)
Cost : Ph Pesos 20 Million (US$ 400,000)

Canadian Embassy Technical Review

Previously located at the Allied Bank Building on Ayala Avenue, the Canadian
Embassy relocated to the 6th, 7th and 8th Floor of RCBC Plaza Building, being one of Makati’s intelligent buildings that is strategically located at the main gateway of the city’s central business district. Facilities include BMS, high-speed elevators, fire protection and detection system, and security system that fit well with the Embassy’s requirements for an efficient standards in the conduct of their diplomatic missions and consular operations in the hilippines.
IACAI provided Technical Review services for a period of two (2) months
during the post-fitout phase.

Client : Canada Department of Foreign Affairs & International Trade
Area : 5,200 square meters (55,944 sq. ft.)
Cost : Ph Pesos 150 Million (US$ 2.80 Million)

MAKRO Philippines Headquarters and Store 4

Located along the South Superhighway at the Sucat Avenue exit, in the
city of Parañaque, the MAKRO Store #4 and Headquarters for the Philippine arm of the international membership retail chain maintains offices adjacent to their shopping facility. The store has a large, warehouse-style, open shopping area under one roof, containing one of the largest commercial outlets in the Philippines. Other features include dining facilities, branch banks, and offices.
IACAI provided Project and Construction Management services for the
7 month-design and 6- month construction periods.

Client : MAKRO Philippines, Inc.
Area : 14,500 square meters (160,000 sq. ft.)
Cost : Ph Pesos 400 Million (US$ 12 Million)

ABN AMRO Offices Relocation

Relocated to the 18th and 19th floors of the LKG Tower along Ayala Avenue in the business district of Makati, the offices of ABN AMRO now makes their new home for Investment Banking Facilities. The strategic planning of ABN AMRO Philippine operations required a revised strategy of planning for their facilities. provided Project and Construction Management and Cost Estimating services during the extremely ambitious 30-day planning and 60-day construction periods.

Client : ABN AMRO Philippines, Inc.
Area : 3,200 square meters (35,000 sq. ft.)
Cost : Ph. Pesos 50 Million (US$ 1 Million)


 

Adress : Unit 604 Cattleya Bldg., 235 Salcedo St., Legaspi Village, Makati City 1229 Philippines
Phone : (063-2) 893-4931, Fax: (063-2) 813-1699
copyright 2015 I.A CAMPBELL. All rights reserved.